This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies By closing this message or continuing to use our site, you agree to our cookie policy. Learn MoreThis website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
An international commercial building institution makes a corporate decision to create a BETA test site of its corporate office complex to integrate smartwatch technology into its BAS computer system.
An international commercial building institution makes a corporate decision to create a BETA test site of its corporate office complex to integrate smartwatch technology into its BAS computer system.
The finalized system selection shall consist of a replacement cooling tower and standby cooling tower to serve the financial institution’s data center.
The finalized system selection shall consist of a replacement cooling tower and standby cooling tower to serve the financial institution’s data center.
The existing central plant shall provide heating in the winter to maintain 68°F during occupied cycle and 60° during unoccupied cycles of the individual tenant-leased zones.
The existing central plant shall provide heating in the winter to maintain 68°F during occupied cycle and 60° during unoccupied cycles of the individual tenant-leased zones.
This optimum boiler heating equipment selection and the project’s design intent document are based on the analytical process outlined in ASHRAE Handbook 2020, Chapter 1, 'HVAC System Analysis and Selection'
This optimum boiler heating equipment selection and the project’s design intent document are based on the analytical process outlined in ASHRAE Handbook 2020, Chapter 1, 'HVAC System Analysis and Selection'
The chilled water pipe distribution: Schedule 40 black iron steel with 1-inch fiberglass insulation with vapor barrier and additional outdoor weather protecting canvass covering of pipe, valves, and fittings
The chilled water pipe distribution: Schedule 40 black iron steel with 1-inch fiberglass insulation with vapor barrier and additional outdoor weather protecting canvass covering of pipe, valves, and fittings
Energy data will be converted to cost for chilled water as well as other energy meters to capture the total utility cost to operate these individual research labs.
Energy data will be converted to cost for chilled water as well as other energy meters to capture the total utility cost to operate these individual research labs.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.