This month’s B2B focuses on a new cooling tower to serve a pharmaceutical facility’s new process water system. This tower will be a closed-loop, evaporative condenser to operate 24/7/365.
This month’s B2B will focus on a 1,000-kW cogeneration unit with hot water energy recovery to a domestic hot water and process heating system on an existing health care campus. The pre-packaged cogeneration unit shall be located directly outside the central plant electrical room and connected to the existing electrical system.
This month’s B2B will focus on a small city school system that chose to invest in an annual contract for a temporary air-cooled chiller for special events and an emergency crisis shelter center.
This month’s B2B will focus on an existing datacom room located within a 200,000-sq-ft financial business office building. The existing datacom room is being expanded from 10,000 sq ft to 20,000 sq ft.