This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies By closing this message or continuing to use our site, you agree to our cookie policy. Learn MoreThis website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
The chilled water pipe distribution: Schedule 40 black iron steel with 1-inch fiberglass insulation with vapor barrier and additional outdoor weather protecting canvass covering of pipe, valves, and fittings
The chilled water pipe distribution: Schedule 40 black iron steel with 1-inch fiberglass insulation with vapor barrier and additional outdoor weather protecting canvass covering of pipe, valves, and fittings
Energy data will be converted to cost for chilled water as well as other energy meters to capture the total utility cost to operate these individual research labs.
Energy data will be converted to cost for chilled water as well as other energy meters to capture the total utility cost to operate these individual research labs.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.
Specialized systems shall include a new gas-fired steam generator to produce the steam to new humidifiers in existing central air-handling units and specific areas of the building. Also, a new reverse-osmosis (RO) water system will serve the 100% water makeup to the steam generator.
Specialized systems shall include a new gas-fired steam generator to produce the steam to new humidifiers in existing central air-handling units and specific areas of the building. Also, a new reverse-osmosis (RO) water system will serve the 100% water makeup to the steam generator.
The museum administration and its asset management in-house committee have signed a contract with a physician-led firm, offering a PC approach to improve the building environment to assist in furnishing, installing, commissioning, monitoring, measuring, and reporting on the museum’s indoor environment.
The IPD team, which includes corporate management’s building committee of building managers, the leasing manager, capital projects manager, and facility manager — along with a new corporate BIM manager — will design-construct, operate, and maintain BIM contract document standards for all future capital projects, new and tenant fit-out.
The existing equipment to remain as part of the condenser water system includes the plate and frame heat exchangers and split-case pumps with standby pumps, each with variable frequency drives (VFDs).
The design criteria is based on an analytical analysis of existing refrigeration conditions, associated operation, and proactive maintenance management in sync with the hospital’s overall updating the policy and procedure manual as it pertains to refrigerant management and the environment.