Replacement of a 30-year old fire-tube boiler with a new 95% efficient gas-fired steam condensing boiler to serve a university’s main campus cafeteria.
Replacement of a 30-year old fire-tube boiler with a new 95% efficient gas-fired steam condensing boiler to serve a university’s main campus cafeteria.
The retrofit project provides continuous building-by-building monitoring energy and utility cost analysis inventorying the chilled water flow meters and Btuh energy metering to determine decarbonization results.
The existing HVAC systems shall be retro-commissioned to meet the original design intent, including the individual classroom occupancy schedule during the school day.
The existing HVAC systems shall be retro-commissioned to meet the original design intent, including the individual classroom occupancy schedule during the school day.
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
An international commercial building institution makes a corporate decision to create a BETA test site of its corporate office complex to integrate smartwatch technology into its BAS computer system.
An international commercial building institution makes a corporate decision to create a BETA test site of its corporate office complex to integrate smartwatch technology into its BAS computer system.
The finalized system selection shall consist of a replacement cooling tower and standby cooling tower to serve the financial institution’s data center.