HVAC Design/Construction Process

Checklists, design-build, commissioning, integrated design ... better projects through a bigger picture.

ARTICLES

COMMISSIONING

Commissioning Action Lists: Keeping Them Under Control, Part 3

Don’t let this trio of developments throw you off your game.
I will close out 2014 with this final column about how to avoid excessively long commissioning action lists (CALs).
Read More

District Chilled Water Systems Design: A Tale Of Two Footprints

Circumstances converged to construct a pair of plants on campus in a short timeframe. However, these projects weren’t identical twins by any means: different needs, locations, and other factors drove some major differences, from cooling towers to standby power.
Read More
COMMISSIONING

Commissioning Action Lists: Keeping Them Under Control, Part 2

Some coordinated drudgery up front will prevent unwanted drama on the back end.
This month’s column is a continuation of my September and October columns regarding excessively long commissioning action lists (CALs). I will continue exploring the multiple reasons why the CAL might get out of hand, who might be responsible, and what the commissioning professional might do about it.
Read More
BACK 2 BASICS

Building Program To Basis Of Design For An Office Space Tenant Retrofit Building Project

The majority of, if not all, office buildings will go through a series of office space retrofits over the course of time
Read More
TOMORROW’S ENVIRONMENT

Advice For First-Time Managers

Draw your map, and help others draw theirs.
Several years ago, I wrote book titled Managing People In The HVAC/R Industry, and in it, I dedicated a chapter to those who take on the challenge of being a first-time manager.
Read More

Designs That Integrate — Applying ASHRAE 90.1

Luxury retail, data centers, retrofitted corporate space … they all had to meet 90.1. From lighting upgrades to custom coils on a factory chiller, explore specifics while absorbing the message to increase team integration earlier in the process.
ASHRAE 90.1, Energy Standard for Buildings, has served as a benchmark for both new and retrofit commercial building design for the last 35 years and continues to lead today’s sustainably minded business culture.
Read More
COMMISSIONING

Commissioning Action Lists: Keeping Them Under Control, Part 1

Schedules can get out of control for several reasons. What’s to be done to prevent or minimize the fallout?
Last month, this column introduced the concept of an “excessively long” commissioning action list (CAL).
Read More
TOMORROW’S ENVIRONMENT

Dress For Success

What you wear says a lot about who you are.
Back in 1975, John T. Molloy wrote a book titled Dress for Success.
Read More

Controllers: Reliable Controls

Reliable Controls has released the MACH-Pro1 and MACH-Pro2, fully programmable, BACnet® building controllers (B-BC). The MACH-Pro1 is designed for mid-sized rooftop equipment or small mechanical room applications, while the MACH-Pro2 provides expanded capabilities ideally suited to large, MS/TP rooftop equipment and mid-sized mechanical room applications.


Read More
TOMORROW’S ENVIRONMENT

Leaving A Legacy

Who does that? Don’t rule yourself out too quickly.
If you are one of the fortunate ones to have had the opportunity to work in the building industry throughout your career, you probably don’t think you can or will leave a legacy for others to benefit from being in this business.
Read More

EVENTS

Industry

2015 AHR EXPO

1/26/15
McCormick Place Convention Center
Chicago, IL
United States
The world’s largest trade show exclusively for the heating, ventilation, air conditioning and refrigeration industry Read More

Industry

2015 National HVACR Educators / Trainers Conference and Policy Forum

3/15/15
Florida Hotel and Conference Center
Orlando, FL
United States

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!

Engineered Systems Magazine

image

2014 December

Check out the December 2014 issue of Engineered Systems.
Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+