This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies By closing this message or continuing to use our site, you agree to our cookie policy. Learn MoreThis website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
The HVAC system selection and design intent is based on the processed outlined in ASHRAE Handbook 2020, Chapter 1, “HVAC System Analysis and Selection.”
Karine Leblanc recently conducted a number of interviews with HVACR engineers. Here is Part 2 of that series, featuring Angie Simon, P.E., president of Western Allied Mechanical.
SmithGroup led the teams through an immersive — and rapid — design-thinking workshop, where each team developed an actionable prototype to bring back to their institutions.
Ash Awad, chief market officer, McKinstry, discusses the firm’s pledge to achieve net-zero annual carbon emissions by no later than 2040; the design work behind the Catalyst facility in Spokane, Washington; and much more.
Unlike the design-bid-build delivery method, the design-build delivery method brings both design and construction functions together as one team in a single contractual entity to the owner.
Lean IPD provides a structure for collaboration and coordination between the owner, designers, and builders far beyond what can occur in the typical design-bid-build construction process.