I was reminded recently of the value of testing, adjusting, and balancing (TAB) coordination for enhancing the efficiency and success of HVAC commissioning.
One of the most valuable deliverables from a design and construction project are the as-built drawings (often referred to interchangeably as record drawings).
The firm added new offices in Colorado and Virginia, entered the Bahamas market, welcomed 200 new associates, added 1,000-plus new contracts, and more.
There are some building types and/or organizations that are nearly always undergoing some sort of facility upgrade, modification, and/or expansion to accommodate evolving needs.