ES mobile app

Coming Soon...our new mobile app!

Articles by Howard McKew, P.E., C.P.E.

Back 2 Basics

Building Programs To Basis Of Design For A Mission Critical Tenant Fit-out Project

April 1, 2014
At some point in time, most mission critical companies will make the decision to expand their data center space by either outsourcing the mission critical expansion add-on or new space, or lease a tenant space that has already been designed to accept a mission critical data center.
Read More
Tomorrow's Environment

Doing The Right Thing

Pointing out design flaws isn’t easy, but engineers must apply their best assessments for the building owner.
April 1, 2014
The other day, a colleague of mine mentioned to me that she was taking on a project where others in her company were not happy.
Read More
Tomorrow's Environment

Prepare And Complete An HVAC Project Closeout Punch List

It’s nobody’s favorite part, but the road to performance goes through this paperwork.
March 1, 2014
This is the fourth and final column on preparation and completing specific consulting engineering tasks that are traditionally covered in the design engineering firm’s consulting fee.
Read More
Back 2 Basics

Building Program To Basis Of Design For A New Commercial Office Building Shell & Core Building Project

March 1, 2014
At some point in time, most building owners make the business decision to build, renovate, or expand their facility.
Read More
Tomorrow’s Environment

Preparing For And Assisting In System Startup

When it’s time to flip the switch, design engineers must be present to ensure proper system design.
February 1, 2014
Many consulting engineers will tell you that time invested in the construction phase is beyond their scope of work and, of course, the fee has been all used up and “we can’t afford to waste our time” with equipment and associated system startup.
Read More
Back 2 Basics

Building Program to Basis of Design for a Museum Addition Building Project

January 22, 2014
At some point in time, most building owners make the business decision to build, renovate, or expand their facilities
Read More
Back 2 Basics

Building Program to Basis of Design for an Assisted Living Building Renovation Project

January 2, 2014
At some point in time, most building owners make the business decision to build, renovate, or expand their facilities.
Read More
Tomorrow's Environment

Preparing For And Completing A Construction Site Field Visit

Here are some things to remember, bring along, and follow up about when seeing how the project is going.
January 2, 2014
Here are my suggestions for preparing to complete a construction administration site visit as the design engineer for the project.
Read More
Back 2 Basics

Energy Retro-Cx

December 1, 2013
MONTH 3- The Energy Conservation Opportunity: Process Heating for an Industrial Building Application - Solution Implementation and Monitor, Measure, and Benchmarking
Read More
Tomorrow’s Environment

Prepare To Attend A Construction Meeting

Construction projects are only as successful as construction meetings. The first of four parts begins to get everyone on board and on the right track.
December 1, 2013
This month and in the next three months, I will be sharing my experience pertaining to a design engineer who is responsible for the construction administration of the project he just completed the design for, with construction underway.
Read More

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
3/25/14 2:00 pm EST

Improving Cooling and PUE in Existing Data Centers

On-Demand This webinar will provide cost-effective practical tips and feasible retrofit solutions that can be implemented in operational data centers to address some cooling issues and improve energy efficiency.

THE MAGAZINE

Engineered Systems Magazine

ES April 2014 cover

2014 April

Check out the April 2014 issue of Engineered Systems, with features on backup power supply requirements, cyberattacks, and much more!

Table Of Contents Subscribe

Design Flaws

Following up on Howard McKew's April "Tomorrow's Environment" column: Have you ever thought twice about reporting problems with another firm's design? What did you do?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon