This month’s Facility File will focus on the B2B November test for HVAC applications to replace an existing cooling tower at a pharmaceutical facility.
This month’s Facility File is based on a project renovation of an 80,000-sq-ft existing commercial office building being renovated to an outpatient health care facility.
This month’s B2B will focus on the B2B July test for HVAC applications of an existing emergency space renovation and is based on chapter 8 (Health Care Facilities) in the 2015 ASHRAE Handbook — HVAC Applications, It is focused on the temporary HEPA filter systems installed within the construction space to maintain a negative pressure in this space.
This month’s Facility File will focus on the B2B June test for a heating application on a college campus, with a building program removing a dormitory heating system from the campus high-pressure steam system and replacing it with a high-efficiency condensing hot water boiler within the dormitory.
This month’s Facility File will focus on the B2B April test for an HVAC application within a high school facility, with the existing field house HVAC system being retrofitted to serve as an emergency shelter building with its associated locker rooms and toilet facilities.
This month’s Facility File will focus on the B2B January test for hotels, motels, and dormitories described in the 2015 ASHRAE Handbook — HVAC Applications.