The William B. Race Health Sciences Building at Santa Rosa Junior College, in Santa Rosa, CA, was designed with 100% outdoor air not only because of the high-density people loading
The Eastern Illinois University students residing in this 30-year-old twin-tower high-rise averaged two to three calls per day complaining about the lack of heat. An air/dirt separator was a key
The Texas Tech University’s physical plant engineering department had built its own custom hood stacks on-site to meet laboratory exhaust needs, but limited space, funding, and time prompted it to
Erected in 1973, the 12,000-sq-ft Oxnard Civic Center Professional Building in downtown Oxnard, CA, is operational 24/7/365, and its thirtysomething HVAC system was requiring constant repairs with bills often exceeding
At the Regal Cinema 12 in Spokane, WA, use of low intensity infrared gas heaters, each with a 75,000-Btuh heating capacity, has provided protection from the elements for movie patrons
At Glenwood Regional Medical Center, the existing boilers were running constantly, even though the demand for steam from the sterilizers, kitchens, and laundries was intermittent. In addition to being natural
A four-pipe fancoil system met the St. Augustine’s stringent design and construction requirements, and it eliminated the need for originally specified PTAC units that the architect felt would have detracted
The design for a new central plant at Harrah's Bossier City's Louisiana Downs was on the fast track — it needed to produce chilled water in nine months. The team
The Four Seasons hotel group prides itself on a luxury experience and exceptional service. It aims to provide what it refers to as the "Four Seasons experience" at its resorts
Located in Savannah, GA, the Whitaker Building possesses a storied past. The facility was constructed between 1890-1892 following a devastating fire that destroyed the previous structures on the block. At