Instant measurement and production line correction is enabled since calculations are performed in real-time inside the sensor and data is analyzed multiple times per second with integrated software.
The design, build, and certification process, which would normally take upwards of three years, was completed in just 18 months, despite some pandemic-related delays in material deliveries.
As entrepreneurs seek to profit on the budding indoor agricultural market, ensure your firm is ready, willing, and available to fulfill these requests.
The existing central air system with eight terminal reheat coils shall provide space temperature and humidity control to maintain 40%-60% relative humidity within each room while maintaining 68°F in the heating season, 74° in the cooling season, and space pressure maintained at 0.05-inch gage positive pressure.
When the ambient humidity is low, fluid losses through skin and breathing quickly result in mild but impactful dehydration of our respiratory tract and skin.
Fabric duct substitution for metal duct at the Aquatic Center at Mylan Park in Morgantown, West Virginia, cuts HVAC material/labor costs and fast-tracks the project.
One of the most notorious challenges with split-DX dehumidifiers is refrigerant and oil migration. Two Seresco NP-030s solve these challenges by using factory-provided dry coolers to provide air conditioning heat rejection.