Last month’s column walked through the scenario of what might happen if the commissioning professional is not engaged until very late in the construction phase. This is a challenge on many fronts, but the issue raised in March 2016 was the functional performance testing process uncovering the fact that the commissioned systems operate as designed but do not meet the owner’s expectations and/or needs. How can this situation be avoided?