In December 2013, this Commissioning column addressed the challenges posed by controls contractors who “cut and paste” the design engineer’s sequences of operation into the controls submittal. In a nutshell, a seemingly perfect controls submittal can be a red flag that the controls contractor has not given much thought to the specified system performance and the hardware and programming required to achieve that performance.
I received the following response to that column from a controls contractor: