The August issue celebrates industry innovation through the 2022 Commercial Comfort Products of the Year award winners; the reliable and sustainable future of combined heat and power; district energy’s growing role in New York; the all-encompassing work involved with replacing an aging chilled water system; and more. Access the full August issue by clicking here.
The winning products are chosen by a panel of professional engineers who scored each submission based on a number of factors, including efficiency, compatibility, uniqueness, intuitiveness, and more.
The winning products are chosen by a panel of professional engineers who scored each submission based on a number of factors, including efficiency, compatibility, uniqueness, intuitiveness, and more.
A complete transition from fossil fuels to electricity for heating and cooling has the potential to reduce the resiliency of critical facilities unless an on-site backup power supply is provided.
A complete transition from fossil fuels to electricity for heating and cooling has the potential to reduce the resiliency of critical facilities unless an on-site backup power supply is provided.
Success was earned at Memorial Sloan Kettering Cancer Center Middletown, New Jersey, in the form of LEED Gold certification, N+1 reliability, and an ACEC New York Gold Award.
Success was earned at Memorial Sloan Kettering Cancer Center Middletown, New Jersey, in the form of LEED Gold certification, N+1 reliability, and an ACEC New York Gold Award.
How can infectious and noninfectious diseases that spread through the air, are not fully controlled by individual behaviors, and affect “innocent bystanders” be contained to protect the health of the general public?
How can infectious and noninfectious diseases that spread through the air, are not fully controlled by individual behaviors, and affect “innocent bystanders” be contained to protect the health of the general public?
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.