Larry Daniel was looking to add something a little different - call it the "wow factor" - to a new facility in Columbus, OH, for Accor Economy Lodging, parent company of the Red Roof Inn and Motel 6 chains. He found it, and turned a vacant automobile dealership into a state-of-the-art reservation center that will handle approximately seven million customer phone calls annually.

"We wanted to create an environment with a wow factor," Daniel said, Accor's senior vice president for reservations. "We were looking for something unique and appealing to help us attract and retain good employees in a relatively tight labor market."

Creating a "consistent and uniform hvac system" was one of Daniel's criteria. A York FlexSys underfloor air system was selected to deliver conditioned air to 135 workstations in the 14,000-sq-ft call center. According to Daniel, the early-1960s facility provided the shell needed for the call center, with the high arched ceiling adding to the center's spaciousness and aesthetic appeal. Light colors, sound masking, indirect lighting, and ergonomically-designed workstations are just a few of the architectural elements, while employee amenities include an off-duty "community center" complete with a fountain, cyber café, and large-screen television.

"This is a 24-hour call center that will have about 300 employees when fully staffed," Daniel said. "I think we've created a great environment for people to work in. The hvac system is an important element of that environment."

Kuempel Service/Comfort Systems U.S.A. (Cincinnati) was the mechanical contractor on the project, working with KSBA Architects (Pittsburgh), and property developers Flanigan Real Estate Resources (Cincinnati).



There's More Under The Floor Than Empty Space

Flanigan is known for expertise in the design and construction of high-technology work environments. "We saw this as a perfect application for the raised-floor solution," said Mike Flanigan, the firm's president. The rest of the design-build team agreed.

According to John Kuempel, Jr., P.E., sales manager for Comfort Systems, Accor chose raised-floor construction for the call center because of the flexibility it provides in wire management for power, voice, and data networks. Tate Access Floors provided the raised floor and wire systems for the project.

In addition, notes Roger Kingsland, president of KSBA, Accor was attracted to the "quality of the solution in terms of people comfort, air quality, and flexibility." KSBA was an early proponent of underfloor-air systems, according to Kingsland. The firm has incorporated it in building for Liberty Mutual in Phoenix, Telespectrum in Buffalo, and Duquesne Light in Pittsburgh, as well as its own headquarters facility.

"The raised-floor platform answers a lot of the technology need for wire management," Kuempel said. "That's a natural. Now, the introduction of underfloor air with personal control allows each occupant to customize his or her environment."

In the Accor project, two standard, 25-ton packaged rooftop hvac units supply conditioned air to the raised-floor area. The air is distributed to the occupied space by 170 York FlexSys underfloor air terminals. The air terminals can be located anywhere in the raised-floor grid. Then, call center employees can individually adjust air-discharge grilles to any one of 16 different airflow patterns, for highly personalized comfort control.

Kuempel likes the personal control afforded by the underfloor-air system. "It's a highly adjustable air outlet for direct occupant control," he says. In turn, he thinks this can lead to a higher rate of job satisfaction and employee retention.

The York FlexSys system is designed to provide better overall temperature control than first-generation underfloor air systems because each terminal has variable air volume control. Early underfloor air products without automatic air volume controls had a poor reputation for comfort. And, better IAQ is achieved because conditioned air is delivered where it does the most good - at the floor-level breathing zone, not above people's heads. The conditioned air doesn't mix with odors, particles, and pollutants that collect near the ceiling.

"The new Tate/York system represents a paradigm shift in personal comfort," Kuempel says. The concept applied in the Accor call center is called the Building Technology Platform, and integrates access flooring, and the voice, data, and power networks it can house, with an advanced underfloor air distribution and control system.

Bigger First Cost, Longtime Savings

The FlexSys system also offers first-cost and life-cycle-cost savings. Because air moves in the plenum between the structural floor and the access floor, conventional ceiling ductwork can be eliminated. This saves first-cost and frees overhead space for other design purposes.

Rearrangement costs are also reduced. Because the entire area under the floor becomes a pressurized air plenum, a FlexSys terminal can be installed literally anywhere in the raised-floor grid. To shift workstations, maintenance personnel simply move one of the air terminals, bringing hvac to the new location. If necessary, the voice, data, and power cabling can also be moved easily. This can be done much quicker, and at less expense, than with traditional building systems.

Kingsland notes KSBA applies a "performance design approach" in which the firm evaluates the return on investment of various design solutions. They evaluate five main criteria: capital cost, energy cost, health care cost, productivity improvements, and tax impact. He believes the Building Technology Platform, with underfloor air, rates very well in all these areas.

Kingsland summarizes it this way: On capital cost, savings in cabling, and hvac components, including ductwork, offset the cost of the raised floor. Energy savings accrue from longer periods of "free cooling." Health care costs can be reduced by cleaner air. Productivity improvements are a "hands down" winner, considering the ease in changing the FlexSys system. And tax savings can be achieved through an accelerated depreciation schedule, because much of the Building Technology Platform can be considered equipment rather than part of the building. ES