The January issue examines the role of steam in brewery applications, the steps to consider when designing an aspirating smoke detection system in MRI rooms, the importance of third-party TAB certification, and more. Access the full January issue by clicking here.
Given the growing sensitivity to water conservation, and the ever-increasing cost to maintain mechanical systems, closed-loop technology is quickly gaining traction nationwide.
The punch list process can work well for static installation and documentation items but almost never includes dynamic or operational issues at the time of substantial completion.
The museum administration and its asset management in-house committee have signed a contract with a physician-led firm, offering a PC approach to improve the building environment to assist in furnishing, installing, commissioning, monitoring, measuring, and reporting on the museum’s indoor environment.