This month’s B2B will focus on a 1,000-kW cogeneration unit with hot water energy recovery to a domestic hot water and process heating system on an existing health care campus. The pre-packaged cogeneration unit shall be located directly outside the central plant electrical room and connected to the existing electrical system.
There was a time when HVAC consulting engineering firms had a stand-alone HVAC department with a registered professional engineer as the department head.
Quite often, design engineers choose decentralized HVAC systems because of first-cost benefit, packaged equipment, simplicity of design, and the repetitiveness of the installation, to mention just a few of the features.