The existing central air system with eight terminal reheat coils shall provide space temperature and humidity control to maintain 40%-60% relative humidity within each room while maintaining 68°F in the heating season, 74° in the cooling season, and space pressure maintained at 0.05-inch gage positive pressure.
A complete energy audit of the primary-secondary chilled water system from the central chiller plant to the individual buildings that make up a casino’s 12-building complex.
As a result of the COVID-19 pandemic, a major hospital in the southern U.S. has put together an IPD team to update the facility's policy and procedure (P&P) manual with "lessons-learned." This update includes a section on HVAC.
This month, I continue to examine the different project delivery methods (PDMs), focusing on why design-build (D-B) and integrated project delivery (IPD) are superior to design-bid-build (D-B-B) or construction management (CM).
The success of a VRF project is dependent on technicians completing the installation, startup, and pre-commissioning per the manufacturer’s best practices.