Engineering plays a definitive role when it comes to establishing the functional requirements of an occupied or unoccupied space’s supply air methods and devices.
After years of chasing the attractive efficiency numbers offered by water-based evaporative systems, many data center providers are giving air-cooled chillers a second look.
It’s no secret that data centers require a lot of energy. The main driver of data center design engineers’ work is to provide energy-efficient, reliable, and cost-competitive HVAC systems.
We now have the mechanical equipment to create protective buildings, the tools to measure and track the connections between indoor climates, and the computing capabilities to correlate the data to tell us if we are doing things right.
Create a strategic plan prior to opening a building. The plan should include measures to make occupants feel safer, ensuring supply chain for critical items, such as filters and communication plans for building support and safety measures for occupants.
While you may not receive the print magazine in your mailbox after July 1, the traditional magazine layout and format will continue to be available in your email inboxes via our monthly digital editions.