With variable refrigerant flow (VRF) HVAC systems growing in popularity, engineering refrigeration systems can become very intimidating to many design engineers.
What began as an inquiry about a single cooling tower replacement at Mooresville, Indiana-based auto parts manufacturer TOA-USA evolved into a multi-building, A-Z design/build project.
The 65-foot-tall, 134,000-square-foot laboratory consists of 10 testing chambers, allowing AAON to meet and maintain Air-Conditioning Heating and Refrigeration Institute (AHRI) and U.S. Department of Energy (DOE) certifications.
HVACR engineering is chock full of barriers. Whether it’s a lack of qualified employees, design challenges, budgetary issues, security concerns, etc., there’s seemingly always something in the way, throttling your progress.
Forguson leads, manages, and is accountable for the activities of KAI’s finance team, which includes major functions of accounting, budgeting, cash flow analysis, project controls, and financial planning.
Melton brings decades of experience in engineering and construction to his leadership role, including management of major public infrastructure projects throughout the U.S. and Canada.
Model ECV-PM, the latest addition to Greenheck’s ECV line, features an AHRI 1060-certified polymer membrane energy recovery core manufactured from corrugated aluminum sheets used to separate the polymer membrane layers.