This month’s Facility File focuses on retrofitting a hospital’s patient floor with the addition of one fan-powered HEPA filter unit per patient room on a 30-patient room floor. The Facility File will focus on the B2B September test to improve the room air-purification environment and to trap particles that are 0.3 microns or larger.
This month’s Facility File will focus on the Back2Basics test on a hospital capital project to furnish and install a combined heat and power (CHP) co-generator of electricity and use of engine coolant heat rejection directed to the facility’s new pre-heat domestic hot water storage tank.
This month’s Facility File will focus on the B2B June test for the renovation of an office building located on a major corporation’s U.S. headquarters campus. The existing HVAC system to be replaced is an antiquated hot water heating system serving baseboard radiation, unit heaters, and a rooftop HVAC unit.
This month’s Facility File will focus on the B2B June test for the renovation of an office building located on a major corporation’s U.S. headquarters campus. The existing HVAC system to be replaced is an antiquated hot water heating system serving baseboard radiation, unit heaters, and a rooftop HVAC unit.
This month’s Facility File will focus on the B2B May test for an existing datacom room located within a 50,000-square-foot medical records office building.
This month’s Facility File will focus on the B2B April test for a K-8 school temporary heating project in sync with a utility rebate to furnish and install a new 120 boiler horsepower (BHP) condensing boiler application.
This month’s Facility File focuses on the March Back2Basics retrofit of a campus-wide hot water boiler system covering 40 buildings with primary-, secondary-, and tertiary-pumping based on a performance lease agreement to retro-commission the system with a guaranteed operating savings. The university will hire an owner representative to work with a design-build-operate-maintain performance contractor (PC).
This month’s Facility File is based on a new 40,000-square-foot office building HVAC system using VRF heat pump equipment with a focus on the Back2Basics February test. The project will include two VRF systems, each serving approximately 20,000 square feet of space. The building will also have a 100 percent DOAS gas-fired rooftop HVAC system for ventilation to the occupants in the building.
This month's Facility Files will focus on the Back2Basics test addressing the renovation of an existing Metro station with the addition of a new smoke evacuation system located within the building and within the subway’s inbound and outbound tunnels. The associated ADA-compliant elevator will have its own stand-alone, engineered, smoke control, 100 percent outside air fan to a positive-pressurized elevator shaft system.
This month’s Facility File will focus on the B2B December test for the energy retrofit of a commercial office building hot water heating system conversion from a utility company steam system to a new, high-efficiency condensing boiler system.