Despite being led by a brainless, heartless, and gutless entourage, one may presume that Dorothy could have eventually stumbled her way to the Wizard of Oz’s doorstep with or without the assistance of the yellow brick road.
The recently named Bank of America Tower in Houston was just certified LEED® Version 4 (V4) Platinum for Core and Shell by the U.S. Green Building Council (USGBC).
Situated in the heart of downtown Los Angeles, the Sydell Group purchased the historic Bank of Italy building at Giannini Place with the hopes of bringing the booming success of its original NoMad New York City location to LA.
There are some building types and/or organizations that are nearly always undergoing some sort of facility upgrade, modification, and/or expansion to accommodate evolving needs.
Last month, we discussed having a mid-year sales strategy or course correction. I suggested one should start to plant the seeds to provide a better product at a better price from a team rather than simply sell commodity products to HVAC contractors.
Engineered Systems is dedicated to highlighting the outstanding achievements of the women in engineering through its 20 to Watch: Women in HVAC contest.