Installing UVC technology in AHUs downstream of cooling coils enabled City Hall in Sammamish, WA to reduce HVAC energy and operational costs, improve IAQ, and become the first project to
As part of the quest for a LEED® Platinum certification at this public agency building, Rumsey Engineers was challenged to earn all 10 LEED energy credits on a small budget.
For the first time since 1969, the Dominican Sisters living at this facility have access to cold rather than lukewarm water, as well as nearly instantaneous hot water in all
This facility houses hundreds of cancer research projects that must be maintained within stringent environmental conditions - any changes in temperature and humidity could influence the accuracy of long-running experiments,
Herakles Data had outgrown the capacity of its existing chillers and needed additional capacity that could meet the demands of its mission-critical interior space and ambient temperatures that typically reach
This pool’s original dehumidification unit was approximately 20 years old and in desperate need of replacement before swim team practices and meets began. A new unit now provides pool water
Construction of this high school required a temporary air management solution that would allow workers to apply finishes without having to fire up the permanent HVAC system. In order to
Employing a new acoustically improved HVAC unit at its Audiology Laboratory, where students’ hearing is tested, proved to be a sound decision. The new unit reduced the overall ambient noise
During the 2005-06 heating season, the Learning Center, Enterprise High School, and Shasta High School reduced usage by 73%, 63%, and 49%, respectively, compared to 2001-02 consumption, thanks to extensive
While many types of conservation were employed on the Ethical Culture Fieldston School, one of the major contributions to saving energy was the HVAC equipment. Extensive heat recovery methods were