New Arena Boiler Plant Using Design-Build Project Delivery
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
Owner Team: The arena center building committee, building manager, facility manager, owner’s representative (consultant), a third-party commissioning consultant (CxC), and a security representative (consultant)
Project Delivery Team: Design-build (D-B) project manager, mechanical-general construction coordinator, an HVAC D-B engineer, and a representative from the boiler manufacturer