Futureproofing, fallback options, and drawing out any client custom requirements early can point you toward success in these high-traffic, high-stakes facilities.
Code and regulations require that LEL concentration of hydrogen (H2) be limited to 25% of LEL or 1% of room volume. The room ventilation method can be either forced or natural and either air conditioned or unconditioned.
This month’s Facility File will focus on an industrial facility capital project to furnish and install an emergency generator within its own generator room.
Welcome to our post-show issue. We squeezed in a little AHR/ASHRAE content from Chicago last month thanks to a favorable schedule, but now that we’ve returned back home to unpack the suitcase and the virtual mountain of information, we can serve up some follow-up to the week in Chicago.
Located in Southbank overlooking the Yarra River, Arts Centre Melbourne is Australia’s largest performing arts venue, including three theatre spaces and a concert hall. Arts Centre Melbourne completed an 18-month project that upgraded the chiller and heating hot water systems.
A new HVAC design is expected so save an estimated $918,000 at the REC community center in Grapevine, TX. The savings is projected in operational and energy costs over the heating, cooling, and dehumidification units’ expected 25-year lifecycles.
Data centers continue to evolve and become more efficient. With this in mind, the need for efficient HVAC is becoming essential to ensure cost-effective, reliable operation given servers generate significant amounts of heat.