When the task is installing 12-ton chillers on top of a 15-story building in a busy downtown location, creative thinking and meticulous planning are a must. Murphy & Miller, Inc.
Investment in information technology has surfaced as the top priority among many organizations planning for the future. One such group is Iowa Health System (IHS, Des Moines, IA), which has
Earlier this year, the clock was ticking down for the majestic Pacific Bell (or "PacBell") Center in San Ramon, CA. When the center was built in 1985, its owners chose
The Gran Meliá WTC São Paulo Hotel is one of the most sophisticated hotels in São Paulo, Brazil. It is connected to the World Trade Center (WTC) complex and located
M.C. Real Estate Services (Kansas City, MO) estimates that 60% of its projects in the last five years have been building rehabs rather than new construction. As a strong supporter
Lakeway Center is a commercial, class A Complex consisting of three buildings totaling over 1M rentable sq ft of office and retail space. One Lakeway is 14 stories and 289,000
The anticipation surrounding the construction of a major new school facility is often tempered with concerns about long-term operating costs, particularly recently due to rapidly increasing utility costs. In Northville,
Budgetary restraints were challenging, but they didn't foil attempts by engineers, architects, and contractors to construct a state-of-the-art natatorium for Mainland Regional High School in the Atlantic City, NJ, suburb
There isn't much, if anything, that Jim Thomas, senior facilities engineer, doesn't know about the electrical and mechanical systems in the buildings at the SAS Institute campus near Raleigh, NC.
As energy deregulation continues to roil the California market, the retrofit of two 1,000-ton chillers with variable-frequency drives (vfd’s) at the One America Plaza office tower in San Diego last