The March issue examines the challenges involved with decarbonizing an existing hot water system, examines the industry’s present and future through the eyes of a roundtable of engineering leaders, contemplates how to implement Revit in BIM ventilation spreadsheets, introduces the industry to early energy analysis workflow called ENERGY.Script, and more. Access the full March issue by clicking here.
The ability to completely replace an existing heating system with an all-electric system is optimal for reducing operational carbon but not for life-cycle costs.
The ability to completely replace an existing heating system with an all-electric system is optimal for reducing operational carbon but not for life-cycle costs.
Children in classrooms with higher outdoor air ventilation rates tend to achieve higher scores on standardized tests in math and reading than children in poorly ventilated classrooms.
Children in classrooms with higher outdoor air ventilation rates tend to achieve higher scores on standardized tests in math and reading than children in poorly ventilated classrooms.
There is still too much of a disconnect between what is being learned through the analysis process and what translates to the design team during critical decision-making phases.
There is still too much of a disconnect between what is being learned through the analysis process and what translates to the design team during critical decision-making phases.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.