The existing HVAC systems shall be retro-commissioned to meet the original design intent, including the individual classroom occupancy schedule during the school day.
The existing HVAC systems shall be retro-commissioned to meet the original design intent, including the individual classroom occupancy schedule during the school day.
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
The final boiler system selection is based on methods to furnish and install heat systems to serve a new 150,000-seat arena in an existing office park.
The design criteria shall be based on an analytical analysis of existing HVAC conditions, associated operation, and proactive maintenance management in sync with the hospital’s overall needs, updating the policy and procedure manual as it pertains to occupant comfort and IAQ and infection control.
The existing central plants shall provide heating in the winter to maintain 68°F and 76° in the air conditioning season via a single duct, single zone, providing ventilation air and maintaining a positive building pressure of 0.05 inch gage.
The finalized system selection shall be a decentralized HVAC system with decentralized HVAC air systems and terminal units with central plant heating and central plant air conditioning.
Designers, construction personnel, operators, building management, and building owners need to get up to speed with the topic of resilience going forward.