An international commercial building institution makes a corporate decision to create a BETA test site of its corporate office complex to integrate smartwatch technology into its BAS computer system.
An international commercial building institution makes a corporate decision to create a BETA test site of its corporate office complex to integrate smartwatch technology into its BAS computer system.
The finalized system selection shall consist of a replacement cooling tower and standby cooling tower to serve the financial institution’s data center.
The finalized system selection shall consist of a replacement cooling tower and standby cooling tower to serve the financial institution’s data center.
HVAC security and building safety considerations should begin at the start of the building program in the design-schematic phase and not be an afterthought later in this program.
HVAC security and building safety considerations should begin at the start of the building program in the design-schematic phase and not be an afterthought later in this program.
Ensure the project’s engineered solution is environmentally responsible through value engineering rather than as an HVAC alternate based on a return on investment.
Ensure the project’s engineered solution is environmentally responsible through value engineering rather than as an HVAC alternate based on a return on investment.