Design and Construction Administration For The 21 Century Part 2 Sarah Maston P.E., LE Michael Papagni, EIT August 1, 2007 Redistributing some of the fee, updating your toolbox, and waiting to jump into the design minutiae can pay off in many ways. Fewer drawings, increased time on-site, and more accurateRead More