When a large national retailer wanted to reduce energy costs at one of its new distribution centers in Topeka, KS, it turned to Cambridge Engineering and its High Temperature Heating & Ventilation (HTHV) technology to help them out.
When an industry leading soft drink beverage distributor needed to expand its distribution center, their facility manager and mechanical engineers reviewed heating and ventilating options and made an interesting decision.
Southwest of Capitol Hill, and within an easy walk to the Jefferson Memorial, is a new seven-building, mixed-use urban center called Waterfront Station, located on 1100 and 1101 4th Street SW.
Hearth Pizzeria’s interior entrance area was so cold during the winter months that patrons moved tables and chairs away from the pizzeria’s sunny storefront views of downtown Needham, MA.
The kitchen may prepare individual meals, but its ventilation system was a smorgasbord of unusual and/or ineffective measures. Sample the task force’s recipe for success.
This article describes the remodeling of a hospital kitchen in which workers experienced high temperature and humidity levels, as well as turbulent airflows most of the year.