The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.
If system performance data reaches a dangerous level, condition-based monitoring alerts technicians to proactively correct the problem in time to prevent further damage.
If system performance data reaches a dangerous level, condition-based monitoring alerts technicians to proactively correct the problem in time to prevent further damage.
Grumman|Butkus Associates utilized a design-build retro-commissioning (DBRCx) approach to assist a large for-profit health care organization implement a nationwide retro-commissioning (RCx) program across multiple hospitals.
Grumman|Butkus Associates utilized a design-build retro-commissioning (DBRCx) approach to assist a large for-profit health care organization implement a nationwide retro-commissioning (RCx) program across multiple hospitals.
Systems documentation is critical, because each building’s systems are unique and designed by different engineers for different purposes in different climates in different architectural enclosures in different code jurisdictions.
Systems documentation is critical, because each building’s systems are unique and designed by different engineers for different purposes in different climates in different architectural enclosures in different code jurisdictions.