This month’s Facility File will focus on the Back2Basics test on a hospital capital project to furnish and install a combined heat and power (CHP) co-generator of electricity and use of engine coolant heat rejection directed to the facility’s new pre-heat domestic hot water storage tank.
In my July 2019 column, I mentioned that this month I’d be talking about a technology that could help you to create a reoccurring line of revenue in your consulting and engineering business.
Despite being led by a brainless, heartless, and gutless entourage, one may presume that Dorothy could have eventually stumbled her way to the Wizard of Oz’s doorstep with or without the assistance of the yellow brick road.
Situated in the heart of downtown Los Angeles, the Sydell Group purchased the historic Bank of Italy building at Giannini Place with the hopes of bringing the booming success of its original NoMad New York City location to LA.
This month’s Facility File will focus on the B2B June test for the renovation of an office building located on a major corporation’s U.S. headquarters campus. The existing HVAC system to be replaced is an antiquated hot water heating system serving baseboard radiation, unit heaters, and a rooftop HVAC unit.
Last month, we discussed having a mid-year sales strategy or course correction. I suggested one should start to plant the seeds to provide a better product at a better price from a team rather than simply sell commodity products to HVAC contractors.
Engineered Systems is dedicated to highlighting the outstanding achievements of the women in engineering through its 20 to Watch: Women in HVAC contest.