Another great troubleshooting and tips collection looks at how to solve a wide assortment of problems and, maybe more importantly, how to avoid a range of others in the first place.
This month’s Facility File will focus on the B2B April test for an HVAC application within a high school facility, with the existing field house HVAC system being retrofitted to serve as an emergency shelter building with its associated locker rooms and toilet facilities.
The town of Portsmouth, RI, had four schools (two elementary schools, one middle school, and one high school) with outdated, inefficient gas-fired hot water boilers that were becoming expensive to maintain and operate.
Budget woes. Equipment that has outlived its effectiveness. Unorthodox original decisions and little space to maneuver. The layers are many, but as this project shows, the solutions are there.