This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies By closing this message or continuing to use our site, you agree to our cookie policy. Learn MoreThis website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
When designing a kitchen ventilation system, there are a number of factors that should be considered, such as project budget, building layout, surrounding buildings, system maintenance, operational cost, fire risk from grease buildup, and more.
The opening of a new school is an exciting time. Seeing reactions from students and educators the first time they walk through the door and watching as community members celebrate their investment in education fuels my passion for designing K-12 education environments that inspire students to excel.
The International Building Code defines institutional occupancies under Institutional Group I and includes the use of buildings or structures where care or supervision is provided to persons who are or are not capable of self-preservation without physical assistance.
While both belt and direct drive fans have been around for a long time, the mainstay fan for most industrial fan applications under 250 hp has been the belt drive fan.
The HVAC industry continues to evolve, but what does the future of the built environment look like? Engineered Systems’ editors turned to the winners of the AHR Expo’s Innovation Awards to get their take on where HVAC trends and technology is heading.
Each year, the AHR Expo honors manufacturers that are looking forward and breaking new technological ground. Those manufacturers are presented with Innovation Awards covering 10 categories, including building automation, ventilation, heating, cooling, IAQ, and more.
The Mercedes-Benz Stadium in Atlanta is a $1.5 billion facility covering 2 million square feet. The stadium contains nearly 10 miles of heating, cooling, potable water, and stormwater piping. Construction on this piping system came with its share of challenges.
The Museum of Contemporary Art (MOCA) on downtown Los Angeles’ Grand Avenue required extensive mechanical upgrades to preserve its collection, maintain visitor comfort, and gain tighter control of humidification levels.
Today’s school facility directors are being asked to do more with less. With limited budgets, they are pressured to reduce operating expenses while maintaining healthy and comfortable learning environments for students.