This month’s Facility File focuses on retrofitting a hospital’s patient floor with the addition of one fan-powered HEPA filter unit per patient room on a 30-patient room floor. The Facility File will focus on the B2B September test to improve the room air-purification environment and to trap particles that are 0.3 microns or larger.
What should we do with all these gray-haired baby boomers? Do the brilliant and bold youngsters who seem to dominate the world of creativity and innovation still have a place for us?
During ASHRAE’s June 2019 annual meeting in Kansas City, I became optimistic that the society is truly expanding its horizons to include occupant health as an important building performance metric.
My firm recently completed the design of an off-campus student housing project. This project converted a 21-story, high-rise office building into an apartment-style student housing facility with one to five bedrooms per apartment.
This article describes the remodeling of a hospital kitchen in which workers experienced high temperature and humidity levels as well as turbulent airflows most of the year.
From my perspective of working in the intersection of two very different professions, medicine and design of the built environment, I’m frequently surprised by the resistance of each group to embrace concepts from the “other side.
In April of 2011, the University of Utah broke ground on a renovation to consolidate multiple production centers into a central multi-tier data center in support of their diverse program mix, which includes the university’s Center for High-Performance Computing (CHPC).
This month’s Facility File will focus on the B2B May test for an existing datacom room located within a 50,000-square-foot medical records office building.