There is still too much of a disconnect between what is being learned through the analysis process and what translates to the design team during critical decision-making phases.
There is still too much of a disconnect between what is being learned through the analysis process and what translates to the design team during critical decision-making phases.
The new boiler boasts an electric consumption reduction of up to 65% when compared to burners previously purchased by the New York City Housing Association.
Historical building in Wichita replaces metal-clad cooling tower with engineered plastic model to increase longevity and reduce maintenance; gets bonus aesthetic features as well.
Some key factors in the design of a CHP for health care facilities include various local and national incentives, the utility rate structure, black start capability, and the type of generator to be used in the plant.