This is a story about two new construction commissioning projects with similar challenges and as-yet unwritten endings.
The first project is one in which the commissioning professional was engaged before the schematic design phase, and the project is currently early in construction. The design engineers did not develop a detailed set of control sequences during the design phase. This was despite repeated requests from the commissioning professional for more information regarding the intended operation of the HVAC systems through multiple design review cycles.