The commissioning industry standard is to start commissioning early in a project, preferably during project conceptualization but certainly no later than the design development phase. However, that does not mean every building owner is introducing third-party commissioning in the design phase. It still happens from time to time that a building owner decides to start commissioning near the end of construction.