This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
This Website Uses Cookies
By closing this message or continuing to use our site, you agree to our cookie policy. Learn More
This website requires certain cookies to work and uses other cookies to help you have the best experience. By visiting this website, certain cookies have already been set, which you may delete and block. By closing this message or continuing to use our site, you agree to the use of cookies. Visit our updated privacy and cookie policy to learn more.
ES Magazine logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
ES Magazine logo
  • Home
  • Magazine
    • Current Issue
    • Digital Edition
    • Ad Index
  • Products
  • News
  • Sectors
    • Colleges/ Universities
    • Commercial
    • Government/ Institutional
    • Health Care
    • Hospitality
    • K-12
    • Mission Critical
  • Topics
    • Building Automation
    • Cooling & Chillers
    • Design/ Construction Process
    • Heating & Boilers
    • IAQ
    • Life Safety
    • Motors & Drives
    • Pumps & Flow Controls
    • Retrofits
    • Ventilation
  • Columns
    • Back2Basics
    • Building Automation Column
    • Case In Point
    • Commissioning
    • Editor's Note
    • Facility Files
    • IAQ: A Physician's View
    • Tomorrow's Environment
  • Multimedia
    • Videos
    • Podcasts
    • Webinars
    • Video Spotlights
    • Interactive Spotlights
    • Sneak Peek Spotlight
    • White Paper eBlast
    • Case Study eBlasts
  • Resources
    • eNewsletters
    • Continuing Education
    • White Papers
    • Industry Events
    • ES Store
    • Classifieds
    • Custom Content & Marketing Services
    • Market Research
  • Today's Boiler
    • Today’s Boiler Digital Edition
  • Directory
    • SourceBook
    • Take a Tour
  • Contact
    • Contact Us
    • Advertise
Home » B2B: Energy Retro-Cx
Back2BasicsHeating & Boilers
Back 2 Basics

B2B: Energy Retro-Cx

Month 1 - The Energy Conservation Opportunity: Process Heating for an Industrial Building Application

Back2Basics diagram
September 23, 2013
Howard McKew, P.E., C.P.E.
KEYWORDS retrocommissioning
Reprints
No Comments
MONTH 1- The Energy Conservation Opportunity: Process Heating for an Industrial Building Application
 
This final three-part series for 2013 is a continuation of the July, August, and September industrial heating system application with this month’s focus on the process heating system.
 
The energy retrocommissioning team/auditors for this three-month test series shall include the facility manager, process engineering manager, the building’s ATC technician, retrocommissioning engineer, and TAB engineer.
 
The first step in implementing an energy retrocommissioning initiative for this application can take two different approaches, with the first being the installation of meters to monitor the system so that data can begin to be collected, or the second approach being an initial cursory review of the original design intent versus actual operating conditions. With this second approach, it will be necessary to have an experienced, hands-on design engineer who is capable of making a preliminary assessment of operating conditions as well as original over-design.
 
With any quality control initiative is Step 1: “collect the data.”  Data collection removes the various opinions of everyone speculating on how the system is operating and quite often raises every team member’s awareness to how the system is actually operating and how long the system operates 365 days a year.
 
Still, the second approach often occurs in advance of data collection when an experienced design engineer “walks the system” and takes note of where the various balancing valves are set, what the pump discharge pressure is, what the temperatures are going out to the process equipment, and how many hours this process heating system runs. Based on this walk-through, the energy retrocommissioning team should be able to deter-mine whether there is a potential savings to invest in collecting actual operating data.
 
With this information in hand, we are going to focus on the secondary process heating system as our energy retrocommissioning candidate, but before we do this, we need to first document the original Basis of Design [BofD]. Referring to Amanda Parolise’s The Facility Files, this document should be created to identify the original BofD document followed by documenting during the energy retrocommissioning “solution planning” phase and the proposed BofD based on the Energy Retrocommissioning Study.
 
For this B2B, the secondary heating system application for an industrial facility with three work shifts depending on the work output require-ments based on the company’s sales requires the following steps be taken:
  1. Review existing record drawings and create a system flow diagram to document and create a visual survey aid for the hot water system.  
  2. Inventory hot water system, using system flow diagram to capture the number of process heating equipment.
  3. Inventory the use of 2-way automatic control valves mixed with 3-way automatic control valve use.
  4. Inventory hot water pumps for pump head, motor horsepower, and GPM to confirm connected load and determine whether all equipment will be operating at one time or there should be a diversity factor included in peak flow load. 
  5. Document hot water heating automatic temperature control strategy and compare with system flow diagrams.
  6. Document the 365-day, 24-hour a day schedule to identify current operating hours and projected operating hours based on business production projections.
In this data collection process, we have identified that the secondary heating system operates 24/7/365 to provide process hot water heat alt-hough the building is not occupied 24/7/365.  It was found during the walk-through that the process pumping system is oversized relative to pump head, with associated pump motor horsepower with balancing valves set between 70% open down to 50% open throughout the heating system. 
 
A partial energy retrocommissioning initiative has been completed based on some of the ECM noted in the September 2013 B2B, including changing out the pumps and adding VFDs to each pump. The 3-way ATC valves have been replaced with 2-way/straight-through ATC valves and head-pressure control has been removed. The hot water supply temperature set point has been reset to a lesser primary supply water temperature and is fixed and set in excess of needed temperature.  Based on the original BofD, actual BofD, and the potential to improve system performance without compromising production provides the energy retrocommissioning team several energy conservation measure (ECM) opportunities, including an occupied-unoccupied time clock to shut the secondary process heating system down 8 hrs, five days a week.
 
This month’s test requires the energy auditor to document the existing System Flow Diagram and review the automatic temperature control (ATC) sequence of operation, mode-by-mode, on page 2 of this B2B. The existing ATC sequence will then be inputted into the functional perfor-mance test (FPT) retrocommissioning Cx-3 software, with the reaction device-by-device imbedded into the checklist below the flow diagram. The commissioning engineer working with the rest of the team checks each sequence to confirm each control device passes the specific ATC reaction to verify the existing system ATC/FPT is operating per the original design intent. The answers can be found at www.esmagazine.com. The sequences selected are Off-Fail Safe Conditions, On-Max Winter Heating, and On-Maximum Summer Heating for this B2B test, but there will be other sequences of operation plus verification of alarms and safeties to be confirmed (not part of this B2B test).
 
When the energy auditor and the ATC technician have completed the ATC/FPT process, all deficiencies (fail) will have automatically been inven-toried into the Cx-3 software’s Corrective Action Log requiring further action by the technician for those failed reactions.  
 

ATC DATA ANALYSIS

After completing the initial ATC/FPT process, the energy auditor will begin the data analysis, solution planning, and completion of the Energy Retrocommissioning Report.

es-subscribe

Recent Articles by Howard McKew, P.E., C.P.E.

Engineering Steam Systems -- Another Forgotten Skill

Cooling Tower for a Pharmaceutical Process Cooling Water System — Construction Management Project Delivery

Engineering Refrigeration Systems — A Forgotten Skill

Creatively Creating a Quality Control Checklist

Troubleshooting — Engineering 101, Part 2

Howardmckew_200

You can reach McKew at hmckew@bss-consultant.com or on Facebook at https://www.facebook.com/howard.mckew.

Related Articles

B2B: Energy Retro-Cx

Energy Retro-Cx

Energy Retro-Cx

Energy Retro-Cx

Related Products

Back 2 Basics: Series 1-58

Optimizing Social Media from a B2B Perspective

Energy-Efficient Building Systems

The Green Energy Management Book

Related Directories

Melink Corp.

You must login or register in order to post a comment.

Report Abusive Comment

Subscribe For Free!
  • Print & Digital Edition Subscriptions
  • eNewsletters
  • Online Registration
  • Subscription Customer Service

More Videos

Popular Stories

Dynamic Data Center Workloads Require a Dynamic Cooling Solution

Dynamic Data Center Workloads Require a Dynamic Cooling Solution

Protecting Pharmacists

Protecting Pharmacists: New USP 800 Standards Focus on Safety in Handling Hazardous Drugs

The Dangers of Neglecting Regular Boiler Maintenance

The Dangers of Neglecting Regular Boiler Maintenance

A2L Nov 2019 Figure 1

A2L Refrigerants: Safely Addressing Flammability Concerns

Jeff Edwards

Jeffrey W. Edwards Presented with ASPE Award of Merit

ES-20toWatch-winners250


Todays boiler

Events

December 30, 2030

Webinar Sponsorship Information

For webinar sponsorship information, visit www.bnpevents.com/webinars or email webinars@bnpmedia.com.

View All Submit An Event

Poll

Favorite Engineered Systems columns

Which Engineered Systems column is your favorite:
View Results Poll Archive

Products

The Green Energy Management Book

The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

See More Products

ES Kohler webinar


ES_2018Top10States_360

Engineered Systems Magazine

Engineered Systems December 2019

2019 December

Check out the December 2019 edition of Engineered Systems: Discussion of the "next generation" of building controls, the health impact of indoor particulate matter, evidence-based decision-making in the built environment and much more!
View More Create Account
  • Resources
    • ES Glossary
    • HVAC glossary
    • New Products
    • Mechanical Group
    • Partners
    • List Rental
    • Privacy Policy
    • Survey And Sample
  • Want More
    • Connect
  • Contact

Copyright ©2019. All Rights Reserved BNP Media.

Design, CMS, Hosting & Web Development :: ePublishing