MONTH 2- The Energy Conservation Opportunity: Primary-Secondary Heating at an Industrial Building Application - Air & Water Readings and Solution Plan
Last month, we tested readers on commissioning three of the many automatic temperature control (ATC) sequences of operation associated with the primary-secondary hot water heating system for an industrial building application. This month’s Back2Basic is to water balance this existing system and to test readers on water balancing the primary/secondary water system at maximum design water flow during the heating season. Not included in this test are the following TAB requirements: