In very simplistic terms, building systems controls have evolved as follows:
Pre-1980: Simple and inefficient. Every piece of equipment (furnace, fan, pump, boiler, light, etc.) had its own standalone controller. These controllers were usually very simple switches and thermostats and they operated in ignorance of what other equipment was doing (Figure 1).