In a previous "Getting it Right" column, I discussed the fire alarm testing that a code official performs prior to granting a building occupancy permit. I compared the typical testing a code official would perform to fire alarm testing that a commissioning consultant would perform.
In this column, I discuss other facets of fire alarm system commissioning: design intent document (DID), design review, system readiness checklist, O&M manuals, training, and warranty period follow-up. Except for design review, code officials do not participate in these facets of commissioning.