New Gas-Fired Chiller with Emergency Generator for Data Center Using Construction Management Project Delivery
The chilled water pipe distribution: Schedule 40 black iron steel with 1-inch fiberglass insulation with vapor barrier and additional outdoor weather protecting canvass covering of pipe, valves, and fittings