K-12 Kitchen Ventilation System Replacement Project Using Integrated Project Delivery
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.