Consulting engineers, construction contractors, facility managers, and building operators all strive to achieve exceptional performance from the mechanical systems and related equipment that make up the infrastructure of their buildings. A building automation system (BAS) is one of the keys to that performance, and a sequence of operation explains the job the BAS has to do. This article presents ASHRAE Guideline 36 as a tool to develop a sequence of operation.