Superior Boiler Opens its Third Hutchinson, Kansas, Manufacturing Facility
HUTCHINSON, Kan. — At a grand opening/ribbon-cutting event, Superior Boiler showcased “Plant 3,” its third and newest Hutchinson manufacturing facility. The 75,000-square-foot building was renovated to house Superior’s watertube division, which the company relocated from Richmond, Virginia. Kansas Gov. Laura Kelly, other state and local dignitaries, boiler industry partners, and all Superior employees attended the grand opening.
A state-of-the-art facility, Plant 3 contains several newer-generation cranes, high ceilings, a paint booth with a new collection and filtration system, and, for colder months, floors with radiant heating powered by a Superior hot water boiler. The first watertube boilers manufactured at Plant 3 will be completed by the end of September. The facility is located on 18 acres, allowing for further expansion as needed.