Refine your results by

RTU + ERV = Efficient Outside Air Solution

/ Print /
ShareMore
/ Text Size +
7/19/11 2:00 pm to 7/19/12 EST
Online
Contact: Rebecca Bemke

Starting with a brief look at the demands ASHRAE mandates for commercial buildings, we will examine the design options available to meet the outside air requirements of a facility. We will focus on the conventional straight cooling approach versus the option to pre-treat outside air with an energy recovery devise. We will examine how the use of an ERV is a cost effective way to overcome the demands placed on a system when increasing outside air quantities.

Discussion will include:
· A brief overview of ASHRAE requirements
· Examine the issues caused by increasing OA quantities
· A look at the conventional RTU application versus the use of an ERV
· Review the benefits of ERVs for both design and energy savings
 

Thank you to our sponsor:

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!

Engineered Systems Magazine

image

2014 December

Check out the December 2014 issue of Engineered Systems.
Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+