magazine

Stay Connected with Engineered Systems
We are on Facebook, Twitter, LinkedIn, etc.

Articles by Rebecca Thatcher Ellis, P.E.

Training A Service Contractor

Sidestep present and future problems by incorporating these six elements into your Systems Manual.
Last month, I introduced the importance of providing building-specific training to outside service contractors when a building owner does not have or does not intend to hire in-house O&M staff.
Read More
Commissioning

The Importance of MEP Coordination

Can a project manager overcome the desire to suspend belief in physics and common sense?
Last month, I addressed the challenge faced by new construction project teams to build faster and cheaper. In the normal project delivery process, this responsibility falls on the construction manager and/or general contractor (CMGC).
Read More
Commissioning

Service Contractor Training

Owner assumptions and no formal transfer of knowledge can put a real dent in design intent.
The transfer of knowledge, skills, and documentation to the people responsible for operating new systems is required in order to sustain the benefits of the commissioning process.
Read More
Commissioning

Substantial Completion Confirmation

When is the project complete? Who decides? Here is one example.
This is apt to be the last of my series of columns regarding the relationship between Substantial Completion management and efficient and successful commissioning. Previous columns have addressed various reasons why projects are being declared substantially complete when the building systems are barely functional and ideas for how to improve that situation. This month’s column will look at how substantial completion is actually determined by the owner and/or owner’s representative.
Read More

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
5/13/15 11:00 am EDT

When's & Why's of Fuel Options and Selection for Backup Power

ON DEMAND This presentation will bring listeners up to speed on what the best options are today and in the near future. 

Engineered Systems Magazine

CoverImage

2015 May

Check out the May issue of ES with the cover story: VRF with Heat Recovery Ventilation In PreK-12 Schools.

Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

With access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+