Articles by Rebecca Thatcher Ellis, P.E.

Commissioning

Functional Performance Test Sampling

So you’ve decided on your sample size. What next? What happens when a system failure is found?
Last month, this column addressed the need for (and philosophy behind) sample testing certain systems when 100% functional performance testing (FPT) is impractical from a time and/or budget perspective.
Read More
Commissioning

Functional Performance Test Sampling

Testing it all typically isn’t an option. How to determine what (and how many) to check?
In the standard commissioning process, there are two primary technical activities that occur on site at the end of construction and prior to systems acceptance by the owner.
Read More
Commissioning

Controls Programming Versus Design

Don’t let a “copy and paste” control submittal lead to errors.
This column is a continuation of last month’s topic addressing the coordination that needs to be focused solely on HVAC controls during the construction phase of a project.
Read More
Commissioning

Construction Phase HVAC Controls Coordination

Don’t be the team that finishes the building and then wonders why nobody brought the airflow measuring station.
HVAC systems continue to be the most challenging part of a new construction project to get right the first time, and the most challenging parts of the HVAC systems are their controls. I believe there are two root causes.
Read More
Commissioning

Teams: Lacrosse And Construction

In the game of commissioning and construction, there is no “I” in team. All the players must work together to score the efficiency goal.
I spent many hours this past summer watching my son play lacrosse and couldn’t help thinking about how the team sport of lacrosse is similar to the team sport of design and construction. I’m sure this is analogous to the other team sports that move an object up and down a rectangular field, court, or rink, but this is how I see its comparison with lacrosse.
Read More
Commissioning

Owner Training For Non-Operators

Building owners must be proactive when it comes to safeguarding and maintaining systems at the completion of a building project.
This is the conclusion of my series addressing training for buildings where O&M will be outsourced.
Read More

Training A Service Contractor

Sidestep present and future problems by incorporating these six elements into your Systems Manual.
Last month, I introduced the importance of providing building-specific training to outside service contractors when a building owner does not have or does not intend to hire in-house O&M staff.
Read More
Commissioning

The Importance of MEP Coordination

Can a project manager overcome the desire to suspend belief in physics and common sense?
Last month, I addressed the challenge faced by new construction project teams to build faster and cheaper. In the normal project delivery process, this responsibility falls on the construction manager and/or general contractor (CMGC).
Read More
Commissioning

Service Contractor Training

Owner assumptions and no formal transfer of knowledge can put a real dent in design intent.
The transfer of knowledge, skills, and documentation to the people responsible for operating new systems is required in order to sustain the benefits of the commissioning process.
Read More
Commissioning

Substantial Completion Confirmation

When is the project complete? Who decides? Here is one example.
This is apt to be the last of my series of columns regarding the relationship between Substantial Completion management and efficient and successful commissioning. Previous columns have addressed various reasons why projects are being declared substantially complete when the building systems are barely functional and ideas for how to improve that situation. This month’s column will look at how substantial completion is actually determined by the owner and/or owner’s representative.
Read More

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!

Engineered Systems Magazine

image

2014 December

Check out the December 2014 issue of Engineered Systems.
Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+